Thank you for your feedback! We'll reply on your comments as fast as possible.
850.124
Since 2021 we've already been able to plant 850.124 trees thanks to the wall art sold on Photocircle. They will absorb approximately 5.100.744 kg CO₂ within the next ten years and improve the living conditions of the people locally.
We use essential cookies and, with your consent, additional cookies to improve our website and show you personalized content and ads. You can change your preferences at any time.
Privacy settings
This tool allows you to choose and deactivate different tags, trackers, and analytics tools used on this website.
Categories
Services
Essential
These technologies are necessary to provide the core functionality of the website.
Analytics
These technologies help us analyze the use of the website to measure and optimize its performance.
Marketing
These technologies are used by advertisers to display ads that match your interests.
Functional
These technologies enable us to monitor and analyze website usage to measure and improve performance.
Google Analytics
Service Description
This is an analytics service. The service enables measuring traffic and engagement on websites and mobile apps across devices through customizable reports.
Processing Company
Google Ireland Limited
Google Building Gordon House, 4 Barrow St, Dublin, D04 E5W5, Ireland
Data Protection Officer of the Processing Company
Below you will find the email address of the data protection officer of the processing company:
The primary processing of the collected data takes place within the European Union.
Retention Period
The data is stored as long as it is required for the stated processing purposes. Customers can define the retention period for Google Analytics data, with a maximum retention period of 14 months.
Transfer to Third Countries
The collected data may be transferred to countries that may not have the required data protection standards. These include:
Singapore
Taiwan
Chile
United States of America
For more information on security measures, please refer to the data protection policy of the provider or contact them directly.
The primary processing of collected data takes place within the European Union. If data is processed in other countries, you will be informed separately.
Retention Period
Data is stored only as long as necessary for the respective processing purposes. Log data is anonymized after 9 months, and cookie information is anonymized after 18 months.
Transfer to Third Countries
Collected data may be transferred to countries that may not have the same level of data protection as the European Union. The recipient countries include:
Chile
Singapore
Taiwan
United States of America
For more information about security measures, please refer to the provider’s privacy policy or contact the provider directly.
The maximum storage duration for cookies is 1 year.
Stored Information
NID – Used for advertising or retargeting. Type: Cookie Duration: 6 months
__gads – Used for advertising or retargeting. Type: Cookie Duration: 1 year, 1 month
pm_sess – Ensures that requests come from a user. Type: Cookie Duration: 30 minutes
ANID – Displays ads on websites outside of Google. Type: Cookie Duration: 1 year, 1 month
_gcl_au – Stores and tracks conversions. Type: Cookie Duration: 2 months, 29 days
FPGCLAW – Tracks campaign-related user information. Type: Cookie Duration: 2 months, 29 days
FPGCLGB – Tracks campaign-related user information. Type: Cookie Duration: 2 months, 29 days
_gcl_gb – Tracks campaign-related user information. Type: Cookie Duration: 2 months, 29 days
_gac_gb_ – Tracks campaign-related user information. Type: Cookie Duration: 2 months, 29 days
_gcl_aw – Set when a user arrives via a Google ad. Type: Cookie Duration: 2 months, 29 days
YSC – Stores and tracks user interaction. Type: Cookie Duration: Session
1P_JAR – Collects information about website usage and previously viewed ads. Type: Cookie Duration: 30 days
AID – Links activity across devices where the user is logged into a Google account. Type: Cookie Duration: 1 year, 1 month
FPAU – Collects user information for analytics and reporting purposes. Type: Cookie Duration: 2 months, 29 days
Facebook
Description of the Service
This service is a tracking technology provided by Meta and used in various Meta services. It allows tracking of visitor interactions with websites ("events") after they have clicked on an advertisement displayed on Facebook or other services provided by Meta ("conversion tracking").
Processing Company
Meta Platforms Ireland Ltd.
4 Grand Canal Square, Grand Canal Harbour, Dublin, D02, Ireland
Data Protection Officer of the Processing Company
You can find the contact details of the Data Protection Officer at:
The primary processing of collected data takes place within the European Union. If data is processed in other countries, you will be informed separately.
Retention Period
Data is stored only as long as necessary for the respective processing purposes. User interactions recorded on websites are stored for no longer than two years. However, data is deleted as soon as it is no longer needed for processing purposes.
Transfer to Third Countries
Collected data may be transferred to countries that may not have the same level of data protection as the European Union. The recipient countries include:
Singapore
United States of America
United Kingdom
For more information about security measures, please refer to the provider’s privacy policy or contact the provider directly.
The maximum storage duration for cookies is 1 year.
No other storage methods besides cookies are used.
Stored Information
_fbp – Meta cookie used for website analytics, ad targeting, and ad measurement. Type: Cookie Duration: 3 months
Microsoft ADV
Description of the Service
This service is a tracking and advertising technology provided by Microsoft. It enables the collection and analysis of user interactions to deliver targeted advertisements.
Processing Company
Microsoft Ireland Operations Limited
One Microsoft Place, South County Business Park, Leopardstown, Dublin 18, Ireland
Data Protection Officer of the Processing Company
You can find the contact details of the Data Protection Officer at:
The primary processing of collected data takes place within the European Union. If data is processed in other countries, you will be informed separately.
Retention Period
Data is only stored as long as necessary for the respective processing purposes. Once the data is no longer required, it will be deleted.
Transfer to Third Countries
The collected data may be transferred worldwide, including countries that may not have the same level of data protection as the European Union.
MSCC – Tracks user behavior through the site and interactions with the Bing Maps API. Type: Cookie Duration: 6 months
ABDEF – Used by the Microsoft Bing advertising network for advertisement tracking purposes. Type: Cookie Duration: Session
_uetvid – Tracking cookie used for targeted advertising. Type: Cookie Duration: 1 year, 24 days
Adcell
Use of Tracking Cookies by Firstlead GmbH / ADCELL
This website uses tracking technologies from Firstlead GmbH under the ADCELL brand (www.adcell.de). When a visitor clicks on an advertisement with a partner link, a cookie is stored on their device.
Purpose of Data Processing
Firstlead GmbH / ADCELL uses cookies to track the origin of orders. In addition, tracking pixels are used to analyze visitor traffic on the website.
Collected Data and Storage
The information collected through cookies and tracking pixels regarding the use of this website (including the IP address) and the delivery of advertising formats is transmitted to and stored on a server of Firstlead GmbH / ADCELL.
Among other things, Firstlead GmbH / ADCELL can determine whether a partner link on this website has been clicked.
Data Sharing
In certain cases, Firstlead GmbH / ADCELL may share anonymized information with contractual partners. However, data such as IP addresses will not be combined with other stored data.
Legal Basis
Data processing is carried out based on:
Article 6(1)(a) GDPR
Right to Object
Users can prevent cookies from being set by adjusting their browser settings or delete already stored cookies. For more information on ADCELL’s data privacy policy, please visit: